{"id":2698,"date":"2017-02-03T14:13:51","date_gmt":"2017-02-03T08:28:51","guid":{"rendered":"http:\/\/nepalmediaonline.com\/Nmedia\/?p=2698"},"modified":"2017-02-03T14:13:51","modified_gmt":"2017-02-03T08:28:51","slug":"500-kilowatts-electricity-generated-to-illuminate-beni-bazaar","status":"publish","type":"post","link":"http:\/\/nepalmediaonline.com\/Nmedia\/archives\/2698","title":{"rendered":"500 kilowatts electricity generated to illuminate Beni Bazaar"},"content":{"rendered":"<h3 class=\"popTit\" style=\"text-align: justify;\"><\/h3>\n<div>\n<p class=\"popPara\" style=\"text-align: justify;\">Myagdi, Feb 3rd 2017 : Kaligandaki Energy Development Consumer Committee has spearheaded an effort to generate 500 kilowatts of energy from Beni, the confluence of Myagdi and Kaligandaki rivers.<\/p>\n<p class=\"popPara\" style=\"text-align: justify;\">\nThe electric power was generated at a total investment of Rs 500,000 in which the consumer committee donated Rs 450,000 and Beni Municipality chipped in with Rs 50,000. The power will light up Beni Bazaar&#8217;s Bank Road, Sangam Chowk, Indrenitole and Awaroad, Committee Chairman Gyanendra Shrestha said.<\/p>\n<p class=\"popPara\" style=\"text-align: justify;\">\nHe added that the electricity was generated with planning and technical support of one Durga Prasad Shrestha, who has a long experience in the energy sector.<\/p>\n<p class=\"popPara\" style=\"text-align: justify;\">\nThe Myagdi and Kaligandaki rivers can be used to provide enough electricity for Beni Bazaar if Shrestha&#8217;s technical skills can be used along with necessary investment; Committee&#8217;s Secretary Rudra Prasad Subedi shared.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><p>Myagdi, Feb 3rd 2017 : Kaligandaki Energy Development Consumer Committee has spearheaded an effort to generate 500 kilowatts of energy from Beni, the confluence of Myagdi and Kaligandaki rivers. The <a class=\"mh-excerpt-more\" href=\"http:\/\/nepalmediaonline.com\/Nmedia\/archives\/2698\" title=\"500 kilowatts electricity generated to illuminate Beni Bazaar\">[\u0925\u092a \u0938\u092e\u093e\u091a\u093e\u0930&#8230;..\/Read More&#8230;]<\/a><\/p>\n<\/div>","protected":false},"author":1,"featured_media":2696,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0},"categories":[15],"tags":[],"_links":{"self":[{"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/posts\/2698"}],"collection":[{"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/comments?post=2698"}],"version-history":[{"count":1,"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/posts\/2698\/revisions"}],"predecessor-version":[{"id":2699,"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/posts\/2698\/revisions\/2699"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/media\/2696"}],"wp:attachment":[{"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/media?parent=2698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/categories?post=2698"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/nepalmediaonline.com\/Nmedia\/wp-json\/wp\/v2\/tags?post=2698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}